Emergency Repair to a Damaged 12 kv circuit

A serious construction accident toppled 150 feet of 12 KV circuit, two poles were broken, along with numerous bell insulators . It was truly a miracle that no one was hurt. Read how we got the customer back on line in 18 hours.

Read Case Study

HDD Pulls Back 26 Ducts

When major tollways and highways expand other utilities are impacted. Everything from storm drains, water mains and pipelines, to electric and telephone cables. There are times when these can be major impacts. On a recent project to relocate communication infra structure 26 ducts were pulled through three separate drill holes under a rail road an, open drainage culvert and a major 8 lane tollway.

Read Case Study
Responsibility is the foundation for all we do.

For over 60 years, we’ve built an environment within our company where safety is everyone’s responsibility. Every phase of every project, we accept nothing less than an accident-free jobsite. We believe this standard leads to safer and more productive jobsites and that’s why we’re dedicated to having the highest level of protection for our employees, our customers and the general public. That’s our standard.

Project Map

project map

60 years of experience serving the utility & wireless industry

Look over our project map. If your projects are located in this area we can help you with any type of Underground Construction, Cell Tower, or DAS project.